Zoning Board of Appeals - July 16,2026

Jul 16, 2026 YouTube

The Somerset Zoning Board of Appeals held a meeting on July 16, 2026, to continue the hearing for a petition by Somerset Energy Storage, LLC (an entity of Flatiron Energy) to construct a commercial battery energy storage system (BESS) at 1606 Riverside Avenue. The meeting began with a lengthy discussion on whether the proposed project qualifies as a "use by right" under the town's zoning bylaw for "storage where goods are within a closed structure." The applicant argued it did, while some board members and public commenters, including Board of Selectmen Chair Alan Smith, contended it was a stretch of the bylaw's intent and should require a special permit. The applicant's counsel also introduced the Dover Amendment, which protects solar-related facilities, as a potential legal framework. The board ultimately decided to table the decision on the use classification to seek more information, including input from the building inspector and further research on the Dover Amendment's applicability. The second major portion of the meeting focused on public safety. The chair read a detailed letter from Fire Chief Jamison T.J. Barrows, dated July 15, 2026, which outlined significant progress in discussions with the applicant and recommended 13 conditions for approval. These conditions included the installation of a Fire Rover remote suppression system, perimeter air quality monitoring, and a third-party technical review. The applicant, Flatiron Energy, presented their safety plans, confirming their agreement to all of the Fire Chief's conditions. Their presentation included details on the lithium iron phosphate (LFP) battery technology, the Fluence SmartStack system, and a plume dispersion study by Hazard Dynamics, which concluded that a worst-case fire would not pose a serious health risk to nearby residents at ground level. Public comment raised concerns about security, terrorism risks for critical infrastructure, and contaminated water runoff. The board decided to continue the hearing to August 6th and voted to extend the application deadline to September 30, 2026.

AI-generated summary. May contain errors. Watch the video to verify.