The Somerset Board of Water and Sewer Commissioners met on November 10, 2026. The commission voted to approve the meeting minutes from October 28, 2026, and authorized Chairman Steven Cadorette to sign the MassDEP project completion certificate for the Somerset Wastewater Pump Station Upgrades Project (CWSRF No. 8630, Project Regulatory Agreement No. CW-23-31). Two proposed engineering task orders—an agreement with Weston & Sampson for emerging contaminants and a Wright-Pierce task order for drought resiliency and water efficiency—were tabled pending final contract details. The board also approved two residential sewer abatements for pool fillings: $215.82 (22,000 gallons) for Clifford Oliveira at 160 Sherman Road and $98.10 (10,000 gallons) for Mary Toulon at 233 Long Hill Avenue.

Superintendent Christopher Wickman provided routine operational updates for both the sewer and water divisions. On the sewer side, staff addressed elevated flows following 2.5 inches of rainfall, continued easement clearing near Slates Ferry behind commercial properties, and responded to a deteriorated 8-inch cast iron sewer main suspended beneath a footbridge near Hawthorne Street. An update was also given on the Holland and Montaup Street sewer repair, where a replacement manhole was installed following a backup and lines were being prepared for camera inspection and cleaning. National Grid had been contacted through claims representatives regarding potential reimbursement.

In the water division, the reservoir stood at 44 inches below full, reflecting favorable conditions compared to the prior year. Wickman reported that customers served by the new booster station on Hortonville Lane had seen water pressure increase to approximately 40 to 45 PSI. Plans were underway to isolate interconnected piping at the Reed Street tank yard to address a faulty isolation valve. Additionally, the department completed water connection inspections for the new Washville car wash on Route 6 and handled heavy foot traffic during the quarterly billing cycle. The board then voted to adjourn to executive session to review and consider the release of executive session minutes dating back to 2020 pursuant to a public records request.

AI-generated summary. May contain errors. Watch the video to verify.

Spotted a mistake? and we’ll check it against the source.